Exhibit 99.1

 

LOGO      

                                                             KPMG LLP

                                                             1676 International Drive

                                                             McLean, VA 22102

 

Independent Accountants’ Report on Applying Agreed-Upon Procedures

Sunrun Inc. (the “Company”)

Credit Suisse Securities (USA) LLC

(together, the “Specified Parties”)

 

Re:

Sunrun Atlas Issuer 2019-2, LLC – Data File Procedures

We have performed the procedures described below, which were agreed to by the Specified Parties, on the specified attributes identified by the Company in an electronic data file entitled “Sunrun Atlas 2019-2 Data Tape (2019.08.22).xlsx” (the “Data File”), provided by the Company on August 22, 2019, containing certain information related to a pool of 28,345 solar assets (the “Solar Assets”) as of July 15, 2019 (the “Cut-off Date”), which we were informed are intended to be included as collateral in the offering by Sunrun Atlas Issuer 2019-2, LLC. The Company is responsible for the specified attributes identified by the Company in the Data File. The sufficiency of these procedures is solely the responsibility of the Specified Parties. Consequently, we make no representation regarding the sufficiency of the procedures described below either for the purpose for which this report has been requested or for any other purpose.

Unless otherwise noted, the following definitions have been adopted in presenting our procedures and findings:

 

   

The term “compared” means compared to the information shown and found it to be in agreement, unless otherwise stated. Such compared information was deemed to be in agreement if differences were within the materiality threshold.

 

   

The term “recomputed” means recalculated and compared the result to the information shown and found it to be in agreement, unless otherwise stated. Such recomputed information was deemed to be in agreement if differences were within the materiality threshold.

 

   

The term “materiality threshold” means that dollar amounts and percentages were within $1.00 and 0.1%, respectively, unless otherwise stated.

 

   

The term “Solar Asset Contract” means the solar power purchase agreement, solar lease agreement, and/or change order documentation thereto.

 

   

The term “FICO Schedule” means extracts of the FICO score associated with each Selected Asset (defined below) from the Company’s Servicing System Screenshots, provided by the Company via electronic mail on July 29, 2019.

 

   

The term “ACH Schedule” means billing type information for each Selected Asset from the Company’s Servicing System Screenshots, provided by the Company via electronic mail on July 29, 2019.

 

   

The term “Estimated PTO Schedule” means an electronic data file entitled “Non-PTO Schedule.xlsx” provided by the Company on August 23, 2019, containing information on estimated PTO dates for Solar Asset Contracts that had not received PTO Notifications as of the Cut-off Date.

KPMG LLP is a Delaware limited liability partnership and the U.S. member

firm of the KPMG network of independent member firms affiliated with

KPMG International Cooperative (“KPMG International”), a Swiss entity.


LOGO

 

   

The term “Source Documents” means the following information provided by the Company for each of the Selected Assets:

 

   

Solar Asset Contract

 

   

Incentive Claim Form (“ICF”)

 

   

FICO Schedule

 

   

ACH Schedule

 

   

Estimated PTO Schedule

 

   

Permission To Operate (“PTO”) Notification (“PTO Notification”)

 

   

Servicing System Screenshots

 

   

Engineering, Procurement and Construction Agreement (“EPC Agreement”)

 

   

Installment Plan

 

   

Performance Based Incentive Contract (“PBI Contract”)

 

A.

We were instructed by the Company to randomly select 300 Solar Assets from the Data File (the “Selected Assets”). A listing of the Selected Assets is attached hereto as Exhibit A. For purposes of this procedure, the Company did not inform us as to the basis for how they determined the number of Solar Assets we were instructed to randomly select from the Data File.

 

B.

For each Selected Asset, we compared or recomputed the attributes listed below in the Data File to or using the corresponding information appearing in the Source Documents. The Specified Parties indicated that the absence of any of the specified Source Documents or the inability to agree the indicated information from the Data File to the Source Documents, utilizing methodologies and instructions provided by the Company (as applicable), for each of the specified attributes indicated below, constituted an exception. The Source Documents are listed in the order of priority until such attribute was agreed.

 

Attribute

  

Source Documents/Methodologies/Instructions

Contract ID

  

Servicing System Screenshots

State of Contract

  

Solar Asset Contract, EPC Agreement

Product Type

  

Solar Asset Contract

Zip Code

  

Solar Asset Contract, EPC Agreement

In-Service Date (PTO Date)

   PTO Notification, Estimated PTO Schedule
   For purposes of this procedure, the Company instructed us to compare the PTO Date to the date of the ICF for Selected Asset Number 88. The system for this Selected Asset was not turned on until the delivery of the ICF and approval of the incentive.

 

2


LOGO

 

Attribute

  

Source Documents/Methodologies/Instructions

System Size (kW)

  

EPC Agreement, Installment Plan

 

For purposes of this procedure, the Company instructed us to consider the System Size (kW) to be in agreement if it was within .01 kW.

Electrical Utility

   PTO Notification, EPC Agreement

Original Term (months)

   Solar Asset Contract

Yr 1 Monthly Payment

   Solar Asset Contract

FICO Score

   FICO Schedule

Contract Type

   Solar Asset Contract

Customer Upfront Payment ($)

  

Solar Asset Contract

 

For contracts with an Upfront Payment that included sales tax, the Company instructed us to recompute the Customer Upfront Payment as the Price per KwH multiplied by the Total Guaranteed Production (kWh). For purposes of this procedure, the Company instructed us to consider the Customer Upfront Payment ($) to be in agreement if it was within 1%.

First Payment Due Date

   Recompute as PTO Date plus 2 months

Last Payment Due Date

   Recompute as First Payment Due Date plus Original Term

Payment Frequency

   Solar Asset Contract

# of Months Since PTO (Seasoning)

   Recompute as the difference between PTO Date and August 31, 2019 in months

Remaining Term of Contract (months)

   Recompute as the difference between Original Term and # of Months Since PTO (Seasoning)

Price per kWh

  

Solar Asset Contract

 

In the event the Contract Type was listed as “Balanced,” we were instructed by the Company to recompute as Yr 1 Monthly Payment multiplied by 12, divided by the Contracted Annual Production (kWh).

 

For purposes of this procedure, the Company instructed us to consider the Price per kWh to be in agreement if it was within $0.01.

Monthly Payment / Price per kWh

Escalator (%)

   Solar Asset Contract

 

3


LOGO

 

Attribute

  

Source Documents/Methodologies/Instructions

Contracted Annual Production (kWh)

   Solar Asset Contract

Stepdown Product Flag (Y/N)

   Servicing System Screenshots

Monthly Payment After Stepdown($)

  

Servicing System Screenshots

 

We were instructed by the Company to only perform this procedure if the Stepdown Product Flag was “Y.”

Total Guaranteed Production (kWh)

   Solar Asset Contract

Contracted Generation Guaranteed (%)

   Solar Asset Contract

Performance Guarantee (PeGu) Method

   Solar Asset Contract

ACH Payment (Y/N)

   ACH Schedule

Installer

   EPC Agreement, Installment Plan

Solar Panel Manufacturer

   EPC Agreement, Installment Plan

Inverter Manufacturer

   EPC Agreement, Installment Plan

Battery Manufacturer

   EPC Agreement, Installment Plan

Performance Based Incentive (PBI) Rate

  

PBI Contract

 

For purposes of this procedure, the Company instructed us to consider the PBI Rate to be in agreement if it was within $0.01.

Performance Based Incentive (PBI) Term

   PBI Contract

Sunrun Originated Asset (Y/N)

  

Solar Asset Contract

 

For Selected Asset Numbers 2 and 88, the Company informed us that these contracts were originated by an exclusive channel partner of Sunrun. Sunrun and the channel partner are party to a Master Turnkey Agreement, under which the channel partner assigns the projects to Sunrun. For purposes of this procedure, the Company instructed us to consider multi-family contracts originated under this Master Turnkey Agreement to be Sunrun Originated.

We found the information listed in the Data File to be in agreement with the corresponding information in the respective Source Documents, except as listed in Exhibit B attached hereto.

There were no conclusions that resulted from the procedures.

This agreed-upon procedures engagement was conducted in accordance with attestation standards established by the American Institute of Certified Public Accountants. We were not engaged to, and did not, conduct an examination or review, the objective of which would be the expression of an opinion or conclusion,

 

4


LOGO

 

respectively, on the specified attributes identified by the Company in the Data File. Accordingly, we do not express such an opinion or conclusion. Had we performed additional procedures, other matters might have come to our attention that would have been reported to you.

The procedures performed were applied based on the information indicated in the Data File, Source Documents, and instructions and methodologies provided by the Company, without verification or evaluation of such information, instructions, and methodologies by us; therefore, we express no opinion or any other form of assurance regarding (i) the physical existence of the Solar Assets, (ii) the reasonableness of the information and instructions provided by the Company, (iii) the reliability or accuracy of the Source Documents which were used in our procedures, or (iv) matters of legal interpretation.

The procedures performed were not intended to address, nor did they address: (i) the conformity of the origination of the Solar Assets to stated underwriting or credit extension guidelines, standards, criteria, or other requirements, (ii) the value of collateral securing any such Solar Asset being securitized, (iii) the compliance of the originator of the Solar Asset with federal, state, and local laws and regulations, or (iv) any other factor or characteristic of the Solar Assets that would be material to the likelihood that the issuer of the asset-backed security will pay interest and principal in accordance with applicable terms and conditions. The procedures performed were not intended to satisfy any criteria for due diligence published by a nationally recognized statistical rating organization (“NRSRO”).

The terms of our engagement are such that we have no obligation to update this report because of events and transactions that may subsequently occur.

This report is intended solely for the information and use of the Specified Parties. It is not intended to be and should not be used by any other person or entity, including investors and NRSROs, who are not identified in the report as Specified Parties but who may have access to this report as required by law or regulation.

/s/ KPMG LLP

McLean, VA

September 26, 2019

 

5


Exhibit A

The Selected Assets

 

Selected

Asset

Number

 

Contract ID

     

Selected

Asset

Number

 

Contract ID

     

Selected

Asset

Number

 

Contract ID

1

  1524334633     41   2023747384     81   1320976447

2

  1061605370     42   2099690661     82   1062655861

3

  1362429823     43   1747063366     83   2041473600

4

  1789056848     44   1255754355     84   1386362860

5

  1550658347     45   1095476719     85   1772962028

6

  2114025717     46   1042338605     86   1835279451

7

  2120222993     47   1590408961     87   1255294352

8

  1317884474     48   2028439718     88   2121339863

9

  2124120903     49   15117c86281     89   1288004442

10

  1376542287     50   1277481161     90   1323724613

11

  1029945447     51   1144812606     91   1748618573

12

  1537147610     52   1562911155     92   1857078097

13

  1319583897     53   1663369247     93   1748888326

14

  1257640984     54   1097046479     94   2032850324

15

  1404561758     55   1946082170     95   2042534920

16

  1639653621     56   1479554868     96   1297114962

17

  1257877889     57   1842764468     97   1801619521

18

  1641712349     58   1933886872     98   1661930758

19

  1304081481     59   1660231324     99   1703713205

20

  1338292175     60   2126498817     100   1973906031

21

  2147075531     61   1499600909     101   1297009257

22

  1063129625     62   1615151568     102   1191429376

23

  1654769496     63   1677186479     103   1076360541

24

  1695776215     64   1206420693     104   1684662941

25

  1438809495     65   1574957349     105   1153973447

26

  1832371202     66   1656080769     106   1882546663

27

  1926610431     67   1318598785     107   1933426071

28

  1868074971     68   1154252890     108   1401565110

29

  1219318426     69   1653259927     109   1432238513

30

  1172939658     70   2046108533     110   1955374651

31

  1996869871     71   1266179134     111   1347144661

32

  1261182563     72   1919877061     112   1242330003

33

  1554008187     73   1303586133     113   2039837547

34

  1951800073     74   1876734936     114   1984924830

35

  1774260839     75   1453543619     115   1207574983

36

  1074026883     76   1746113661     116   1139602310

37

  1382601839     77   1301218397     117   1915422816

38

  1911764520     78   1320321400     118   1856388936

39

  2068549242     79   1944378438     119   1745323395

40

  1564132369     80   1273043346     120   1502867635

 

A-1


Exhibit A

The Selected Assets

 

Selected

Asset

Number

 

Contract ID

     

Selected

Asset

Number

 

Contract ID

     

Selected

Asset

Number

 

Contract ID

121

  1042883387     161   1058283068     201   1375985033

122

  1517604514     162   1111384884     202   1133921242

123

  2040626162     163   1257020955     203   1779382680

124

  1639425432     164   1710179021     204   2104174936

125

  2086695493     165   1462592150     205   1794534022

126

  1018216538     166   1759593526     206   1349303842

127

  1409010972     167   1203305598     207   1387534102

128

  1650802013     168   1680421638     208   1829399877

129

  1255943379     169   1061153237     209   1802943457

130

  1901570258     170   1934872273     210   1615174935

131

  1482008444     171   1018835734     211   2099056399

132

  1805359594     172   1683028553     212   1473290973

133

  1686319689     173   1411729280     213   1001027421

134

  1510744349     174   1569395085     214   1973013831

135

  1769255452     175   1181521769     215   1327888637

136

  1897945472     176   1797130581     216   1449383012

137

  2029996425     177   1074663246     217   1620635369

138

  1972631390     178   1787545037     218   1833929865

139

  1117632585     179   1778870144     219   1023635576

140

  1651643544     180   1065018000     220   1432301037

141

  1014939792     181   2061090801     221   1862025855

142

  1643604888     182   1165775131     222   1539634443

143

  1967315784     183   1765770988     223   1077608016

144

  1883571924     184   1882975033     224   1834544282

145

  1996307075     185   2087915589     225   1773119163

146

  2012056954     186   1050876688     226   1228883703

147

  1607489705     187   2136047293     227   1260409909

148

  1284436702     188   1575559796     228   1622941308

149

  2080113777     189   1414675665     229   1226162197

150

  1294353792     190   2130024131     230   1586026705

151

  1863940283     191   1490956346     231   1202200688

152

  1803890841     192   1401324778     232   1206649175

153

  1917108844     193   1632065568     233   1748072899

154

  1630986199     194   1591708771     234   1827337380

155

  1298777834     195   1546949500     235   1994387156

156

  1141162283     196   1458964727     236   1247096810

157

  2114842529     197   2082289959     237   1818684113

158

  1240084539     198   1557294548     238   1943052419

159

  1890798310     199   1461983361     239   1559661451

160

  1851289069     200   1486122639     240   1340237527

 

A-2


Exhibit A

The Selected Assets

 

 

Selected

Asset

Number

   Contract ID         Selected
Asset
Number
   Contract ID

241

   1441882970       271    1197866821

242

   1527696835       272    1362159917

243

   1177411688       273    1035564900

244

   1875675499       274    1046194642

245

   1006363620       275    1942076044

246

   1016965451       276    1382610742

247

   2014117930       277    1695790460

248

   1480558039       278    1580780461

249

   1203580937       279    1022189347

250

   1832048448       280    1707047742

251

   1828885663       281    1667778590

252

   1298879717       282    1842382466

253

   1041461295       283    2092679367

254

   1746648836       284    1518640797

255

   2121990379       285    1252673213

256

   1784252790       286    1515824280

257

   2036373240       287    1333875984

258

   1878783060       288    1171170072

259

   1280307491       289    1337615813

260

   1751424943       290    1553388227

261

   1332125164       291    2135418418

262

   2138689212       292    1052954132

263

   2069215638       293    1142626640

264

   1966194441       294    1031142625

265

   1613671759       295    1614996690

266

   1130493151       296    1931284665

267

   2063767773       297    1447651928

268

   1587114011       298    1655489009

269

   1672369535       299    1580799303

270

   1346477894       300    1369021076

 

A-3


Exhibit B

Exceptions List

 

Selected Asset

      Number      

   Contract ID   

Attribute

   Per Data File    Per Source
Document
44A    1255754355    Total Guaranteed Production (kWh)    128,070    126,974
89A    1288004442    Total Guaranteed Production (kWh)    117,485    115,046
160B    1851289069    Total Guaranteed Production (kWh)    112,562    108,325
281B    1667778590    Total Guaranteed Production (kWh)    130,621    125,705

A KPMG was informed by the Company that the Company researched the differences identified for this attribute for the Selected Asset and confirmed that manual errors were made during data entry.

B KPMG was informed by the Company that the Company researched the differences identified for this attribute for the Selected Asset and confirmed that the Source Document was generated incorrectly.

 

B-1